pricing plan

Get perfect grades by consistently using www.college-experts.com. Place your order and get a quality paper today. Take advantage of our current 20% discount by using the coupon code GET20


Order a Similar Paper Order a Different Paper

Paper 3 – You are the Director in charge of developing a contract-pricing model for a complex project – to modernize U.S. Navy Aircraft Carrier shipboard radar systems.

Develop a 12-month, high-level pricing plan that proposes 100 employees at these levels and numbers of FTEs: 1 Director, 5 Senior Managers, 20 Senior Developer, and 74 Developers.

Use these base (direct cost rates): Director: $100/hour, Senior Manager: $75/hour, Senior Developer: $65/hour, Developer: $50/hour. The overhead rate is 10%, the G&A rate is 15%, and the permitted fee/profit is 10%.

With this information, develop the overall costs for the project over the 12 months answering the following questions:

1. Show the cost build for each of the above labor categories, and show the overall cost to the client for each of the four categories as well as the total cost of the combined four categories (this combined cost is the cost that would be presented to the federal client). Include in your cost build-out any Indirect costs that you believe are appropriate/related to this proposal.

2. List all of your assumptions for the costs built into the response to question 1.

Your total response should be no more than the equivalent of 3-5 typed, double-spaced pages (plus or minus ten percent). This paper is worth 30 points and see schedule for due date.

Writerbay.net

Do you need help with this or a different assignment? We offer CONFIDENTIAL, ORIGINAL (Turnitin/LopesWrite/SafeAssign checks), and PRIVATE services using latest (within 5 years) peer-reviewed articles. Kindly click on ORDER NOW to receive an A++ paper from our masters- and PhD writers.

Get a 15% discount on your order using the following coupon code SAVE15


Order a Similar Paper Order a Different Paper